- Wang, W. C.* and Demsetz, L. A. (2000), "Model for evaluating networks under correlated uncertainty - NETCOR," Journal of Construction Engineering and Management, ASCE, 126 (6), 458-466. (SCI)
- Wang, W. C.* and Demsetz, L. A. (2000), "Application example for evaluating networks considering correlation," Journal of Construction Engineering and Management, ASCE, 126(6), 467-474. (SCI)
- Wang, W. C.* (2002), "SIM-UTILITY: Model for project ceiling price determination," Journal of Construction Engineering and Management, ASCE, 128(1), 76-84. (SCI)
- Wang, W. C.* (2002), "Simulation-facilitated model for assessing cost correlations," Computer-Aided Civil and Infrastructure Engineering, 17(5), 368-380. (SCI)
- Dzeng, R. J. and Wang, W. C. (2003), "Automatic schedule integration for highway projects," Automation in Construction, 12(4), 447-461. (SCI)
- Yang, J. B. and Wang, W. C. (2003), "Contractor selection by the most advantageous tendering approach in Taiwan," Journal of the Chinese Institute of Engineers, 26(3), 381-387. (short paper) (SCI)
- Wang, W. C.* (2004), "Supporting project cost threshold decisions via a mathematical cost model," International Journal of Project Management, 22(2), 99-108. (EI)
- Dzeng, R. J., Wang, W. C. and Tserng, H. P. (2004), "Module-based construction schedule administration for public infrastructure agencies," Journal of Construction Engineering and Management, ASCE, 130(1), 5-14. (SCI)
- Wang, W. C.* (2004), "Electronic-based procedure for managing unbalanced bids," Journal of Construction Engineering and Management, ASCE, 130(3), 455-460. (SCI)
- Wang, W. C.* (2005), “Closure to electronic-based procedure for managing unbalanced bids,” Journal of Construction Engineering and Management, ASCE, 131(9), 1038-1041. (paper closure) (SCI)
- Wang, W. C.* and Liu, J. J. (2005), "Factor-based path analysis to support subcontractor management," International Journal of Project Management, 23(2), 109-120. (NSC92-2211- E-009-005) (EI)
- Dzeng, R. J., Tserng, H. P. and Wang, W. C. (2005), "Automating schedule review for expressway construction," Journal of Construction Engineering and Management, ASCE, 131(1), 127-136. (SCI)
- Wang, W. C.* and Dzeng, R. J. (2005), "Applying cluster identification algorithm and simulation to generate probabilistic network schedules for design projects," Construction Management and Economics, 23(2), 199-213. (EI)
- Wang, W. C.* and Yang, J. B. (2005) "Applications of electronically facilitated bidding model to preventing construction disputes", Automation in Construction, 14(5), 599-610. (SCI)
- Wang, W. C.* (2005), "Impact of soft logic on the probabilistic duration of construction projects," International Journal of Project Management, 23(8), 600-610. (EI)
- Wang, W. C.*, Wang, H. H., Lai, Y. T. and Li, J. C. (2006), “Unit-price-based model for evaluating competitive bids,” International Journal of Project Management, 24(2), 156-166. (EI)
- Wang, W. C.*, Liu, J. J. and Chou, S. C. (2006) “Simulation-based safety evaluation model integrated with network schedule,” Automation in Construction, 15(3), 341-354. (SCI)
- Wang, W. C.*, Liu, J. J. and Liao, T. S. (2006) “Modeling of design iterations through simulation,” Automation in Construction, 15(5), 589-603. (SCI)
- Wang, W. C.*, Dzeng, R. J., and Lu, Y. H. (2007) “Integration of simulation-based cost model and multi-criteria evaluation model for bid price decisions,” Computer-Aided Civil and Infrastructure Engineering, 22, 223-235. (SCI)
- Lin, C. C., Wang, W. C.* and Yang, J. B. (2007) “Evaluating bid item prices to support contractor selection- a case study,” Journal of the Chinese Institute of Engineers, 30(4), 765-771. (short paper) (SCI)
- Lin, C. C., Wang, W. C.*, and Yu, W. D. (2008) “Improving AHP for construction with an adaptive AHP approach (A3),” Automation in Construction, 17(2), 180-187. (SCI)
- Lai, Y. T., Wang, W. C.* and Wang, H. H. (2008) “AHP- and simulation-based budget determination procedure for public building construction projects,” Automation in Construction, 17(5), 623-632. (SCI)
- Yang, I. T., Wang, W. C., and Yang, Tsu-I, (2011) “Automatic repair of inconsistent pairwise weighting matrices in analytic hierarchy process,” Automation in Construction, 22, 290-297. (SCI)
- Wang, W. C.,* Lin, Y. H., Lin, C. L., Chuang, C. H., and Lee, M. T., (2012) “DEMATEL-based model to improve performance in a matrix organization,” Expert Systems with Applications, 39(5), 4978-4986. (SCI)
- Wang, W. C.,* Wang, S. H., Tsui, Y. K., and Hsu, C. H. (2012) “A factor-based probabilistic cost model to support bid-price estimation,” Expert Systems with Applications, 39(5), 5358-5366. (SCI)
- Hsiao, F. Y., Wang, S. H., Wang, W. C.,* Wen, C. P., and Yu, W. D. (2012) “Neuro-fuzzy cost estimation model enhanced by fast messy genetic algorithms for semiconductor hookup construction,” Computer-Aided Civil and Infrastructure Engineering, 27(10), 764-781. (SCI)
- Wang, W. C.,* Yu, W. D., Yang, I. T., Lin, C. C., Lee, M. T., and Cheng, Y. Y., (2013) “Applying the AHP to support the best-value contractor selection – lessons learned from two case studies in Taiwan,” Journal of Civil Engineering and Management, 19(1), 24-36. (SCI)
- Wang, W. C.,* Weng, S. W., Wang, S. H., and Chen, C. Y. (2014) “Integrating building information models with construction process simulations for project scheduling support,” Automation in Construction, 37(1), 68-80. (SCI)
- Wang, W. C.,* Lin, C. L., Wang, S. H., Liu, J. J., and Lee, M. T. (2014) “Application of importance-satisfaction analysis and influence-relations map to evaluate design delay factors,” Journal of Civil Engineering and Management, 20(4), 497-510. (SCI)
- Chen, C. S., Tsui, Y. K., Dzeng, R. J., and Wang, W. C.* (2015) “Application of project-based change management in construction: a case study,” Journal of Civil Engineering and Management, 21(1), 107-118 (SCI)
- Dzeng, R. J., Wang, W. C., and Hsiao, F. Y. (2015) “Function-space assignment and movement simulation model for building renovation,” Journal of Civil Engineering and Management, 21(5), 578-590 (SCI)
- Wang, S. H., Wang, W. C., Wang, K. C., and Shih-Yu Shih (2015) “Applying building information modeling to support fire safety management,” Automation in Construction, 59, 158-167 (SCI)
- Dzeng, R. J., Wang, W. C., Hsiao, F. Y., and Xie, Y. Q. (2015) “An activity-based simulation model for assessing function space assignment for buildings: a service performance perspective,” Computer-Aided Civil and Infrastructure Engineering, 30(12), 935-950. (SCI)
- Yang, J. B., Wang, H. H., Wang, W. C.,* and Ma, S. M. (2016) “Using data envelopment analysis to support best-value contractor selection,” Journal of Civil Engineering and Management, 22(2), 199-209 (SCI)
- Wang, S. H., Wang, W. C.,* Hsu, P. Y., Chen, C. H., and Wang, K. C. (2016) “Establishing engineering S-curves to evaluate supervision engineer allocations for highway construction projects,” Journal of Civil Engineering and Management, 22(7), 890-902 (SCI)
- Wang, K. C., Wang, W. C*., Wang, H. H., Hsu, P. Y., Wu, W. H., Kung, C. J. (2016) “Applying building information modeling to integrate schedule and cost for establishing construction progress curves,” Automation in Construction, 72, 397-410 (SCI)
- Wang, W. C.,* Bilozerov, T., Dzeng, R. J., Hsiao, F. Y. and Wang, K. C. (2017) “Conceptual cost estimations using neuro-fuzzy and multi-factor evaluation methods for building projects,” Journal of Civil Engineering and Management, 23(1) 1-14 (SCI).
- Yang, L. H., Xu, L. Y., Wang, W. C. *, and Wang, S. H. (2021) “Building Information Model and Optimization Algorithms for Supporting Campus Facility Maintenance Management: A Case Study of Maintaining Water Dispensers,” KSCE Journal of Civil Engineering, 25, 12-27. (SCI).
|